正在看新出台的
Background and Rationale Document for the Asphalt Mix Industry Standard under Ontario’s Local Air Quality Regulation
简单一句话,沥青厂新标准
其中有一段:
A majority of plants operate in urban areas. Most portable asphalt plants operate in rural areas close to the paving project. HMA plants need to be located within 30-60 minutes of travel to the paving site. As a result, they are distributed across Ontario.
说沥青厂必须离施工地点 30--60 分钟的路程,因此安省的沥青厂都在市内。
我怎么从来就没在其他的城市见过这种情况呢? 别的城市怎么就没有遍布沥青厂呢?
我们夏天的时候也铺了 drive way, 沥青用卡车运来就停在旁边等候工人平整和压实路面,再铺上去,我还多嘴问,沥青不会冷了吗?因为我们听到太多次市政府的人说需要沥青厂离市中心近是为了保证沥青不会冷掉,结果工人说没事,继续把路面压来压去的,整完了才倒沥青。
到底是怎么回事呢?如果沥青厂确实需要建在离工地近的地方,我下次要建议市政府在市政厅旁建个沥青厂,服务 downtown core 地区。
Background and Rationale Document for the Asphalt Mix Industry Standard under Ontario’s Local Air Quality Regulation
简单一句话,沥青厂新标准
其中有一段:
A majority of plants operate in urban areas. Most portable asphalt plants operate in rural areas close to the paving project. HMA plants need to be located within 30-60 minutes of travel to the paving site. As a result, they are distributed across Ontario.
说沥青厂必须离施工地点 30--60 分钟的路程,因此安省的沥青厂都在市内。
我怎么从来就没在其他的城市见过这种情况呢? 别的城市怎么就没有遍布沥青厂呢?
我们夏天的时候也铺了 drive way, 沥青用卡车运来就停在旁边等候工人平整和压实路面,再铺上去,我还多嘴问,沥青不会冷了吗?因为我们听到太多次市政府的人说需要沥青厂离市中心近是为了保证沥青不会冷掉,结果工人说没事,继续把路面压来压去的,整完了才倒沥青。
到底是怎么回事呢?如果沥青厂确实需要建在离工地近的地方,我下次要建议市政府在市政厅旁建个沥青厂,服务 downtown core 地区。