回复: 【38项紧缺职业】2010年5月妥投统计
刚查了香港的processing time, Applications received BEWEEN November 28, 2008 and June 25, 2010, 需要13months!这个complete package指的是所有申请表格和补料文件了。
Q 9. What is a complete application package?
It depends on the category you are applying under.
Each category has an
application package on this site with
- the forms you need to fill out, and
- the instruction guide.
There is a Document Checklist in each package that lists everything you must include with the application. (Note: a few of the packages have checklists based on your region.)
If you use the checklists and instruction guide for your category, you can ensure that you include everything you need. If your application is missing any of these items, processing can be delayed.
所以,得花非常的耐心等待了,不是靠我每天刷新家园网或CIC查询页面就行的。。。。唉,折腾=折磨!