一步一步走进加拿大(新:参加殡仪馆举办的烛光晚会)

节节草

幸福的源泉
亚省现在也不太好,据说好多人去bc了。
目前这个职业在萨省和BC省的需求量是要比阿尔伯塔省多一些。
 
俺家娃他爹这个月底毕业,该考的都考了。三级笔试完成,但实习没有。求介绍工作。不介意去外地反正孩子大了。我们在阿省。外省也去。
 
你以前作过运行,如果在安省,直接去评估,可以拿到四级,然后找个三级以上的厂,安省很多化工厂,药厂都是,工作一年,通过四门考试,拿三级。
请教oeatontario:
我是新移民,刚登陆多伦多不久。国内曾经在火电厂工作7年,运行时间6年,中专文凭,函授大专。如果我在TSSA做评估的话,可以直接拿到四级证书吗,还是需要参加四级考试?
四级证书有了的话,现在安省找PE工作难吗?四级如何想升到三级的话,是否一定要在对口企业工作?一般去什么行业,安省水电厂和火电厂招四级运行工吗?
非常感谢!
 
请教oeatontario和老赶兄,这段话刚如何理解?通过面试官的评估和同意后,成功通过相关的考试,取得4级证书?还是评估后可以直接取得四级证书?
A person who is a resident in Ontario and has attained at least twelve months proven and documented practical experience in a power plant from a non-SOPEEC jurisdiction (which is equivalent to that required in Ontario for at least 4th class certification) may, upon assessment and approval of the Chief Officer, be considered to obtain the 4th class Operating Engineer’s certificate upon the successful completion of the required examinations.
 
请教oeatontario和老赶兄,这段话刚如何理解?通过面试官的评估和同意后,成功通过相关的考试,取得4级证书?还是评估后可以直接取得四级证书?
A person who is a resident in Ontario and has attained at least twelve months proven and documented practical experience in a power plant from a non-SOPEEC jurisdiction (which is equivalent to that required in Ontario for at least 4th class certification) may, upon assessment and approval of the Chief Officer, be considered to obtain the 4th class Operating Engineer’s certificate upon the successful completion of the required examinations.
通过评估后,不需四级的steam time,
 
4 级证书是入门证书,工作很难找。
4级升3级, 一定要到能提供3级及以上steam time 的企业工作。
可以去很多行业,但水电不行。安省火电厂目前很难进,而且一般只招2级以上的。
 
Power engineer 入门及证书申请程序,每个省都不太一样,我简单总结一下安省的:

安省power engineer 名称有别与其它各省: operating engineer. 为什么? 据institute of power engineer IPE 解释,是因为安省 professional engineer 对这个名字有意见, IPE和 PEO还在打官司,但目前胜算不大,。

不管叫什么名字,operating engineer 的平均工资其实并不比professional engineer 低。我目前没有统计数字,但有这么几个事实, 一个是我认识不只一个 professional engineer 转行做 operating engineer; 二, 查一查安省 Sun shine list, OPG( ontario power generation), operator 的工资要比engineer 的高。当然,也有很多power engineer 同时又是 professional engineer的,叫 2P, 如果你不想做 chief engineer, 2P 意义不大。

下面讲一讲在安省如何快速入行,
 
对国内移民,快速入行有这么几个途径

1/ 国内工作经历评估,通过后,直接考 4级,考试通过,4级证书到手。 但是。。。。。。

4级工作非常非常难找,为什么?我后面有时间解释:

相比4级,找3级工作容易得多,3级也有捷径,上学:按照 tssa 规定,你在其认可的学校修完所有三级所需的课程和lab,并通过4门三级考试,只需一个月的steam time就可以拿到证书。一个月的steam time is nothing. 用人单位也就认为你是三级了,而且tssa 也会默许你上三级岗。

目前tssa 核准的提供三级课程的学校有三家 Cambrian, Lambton 和 St. Clair College 三家。我建议首选 Cambrian, 其次 Lambton, St.Clair 不到万不得已,千万不要去。

为什么?

安省不同于阿省,学校百花争艳,安省只有一直独秀:Cambrian。Cambrian 历史悠久,校友众多,每年很多公司到校园招聘,工作非常好找。认识的Cambrian 毕业生里,毕业超过一年没工作的好像没有。

还有一点很关键,如果你想毕业就直接拿到三级,在学校期间利用实习机会完成你三级的steam time, 只有上Cambrian。 Lambton 和 St. Clair College 不能提供你三级的steam time的保险,实习单位不会同意你来实习。

Lambton也是一个很好的学校,它的地理位置非常优越,SARNIA,安省的化工城, SUNCOR, SHELL, DOW CHEMICAL 。。。。。几乎所有的有名的化工企业全部在这里,另外,还有三个大的燃机电厂。lambton power station 是安省最后一个烧煤的电厂。如果问我,安省最好找工作的地方在哪里,对operating engineer 而言,Sarnia 。

St. Clair College 就不推荐了,它有一个最大的缺点,七月份毕业。 用人单位一般三四月份开始找人,七月份都休假了。
 
上面提到,上八个月的学,就可以轻松拿到三级,因为对我们而言,三级的考试简单,难的是steam time

那么如果你不想上学,就想马上工作,也有另外一条路可走:

到多伦多任何一个华人培训中心, 快速拿一个 millwright 433A 证书。 4级证 加 millwright , 应该比较容易找到相关工作了
 
安省不同与其他省,有一个专门的 refrigerator operator, 其中又分 class B 和 class A. Class B 是入门证书,也可以通过 Tssa 的评估来获得。

由于制冷食品行业也大量使用压力容器,同时很多也有锅炉,因此在安省 制冷企业也必须要雇用 operating engineer。 三级的operating engineer 是最受欢迎的,为什么?因为安省又规定, 三级的operating engineer 等同于 refrigerator operator class B。

雇一个三级的,等于同时雇了2个人,哪个企业不想这么做?这就造成了三级的短缺。

这个时候,如果你同时通过了4级和 refrigerator operator B 的评估,你在制冷食品行业就相当于有了3级证书。工作应该很好找了。
 
安省operating engineer 待遇最好的要数几个火电厂

下面是安省火电厂列表,分别列出了名称, 发电厂投产时间, IESO上网电量和地点
Fossil fuel
List of all fossil fuel generating stations in Ontario.
Name Date Capacity (MW) Location Owner Type Ref
Essar Cogeneration Facility June 13, 2009 63.0
46°31′21″N84°21′32″W Algoma Energy LP Blast Furnace Gas [4]
Brighton Beach Generating Station 580 Windsor ATCO Power, Ontario Power Generation Natural gas [5]
Cardinal Cogeneration Plant 156 Cardinal Macquarie Power & Infrastructure Natural gas [6]
Cochrane Cogeneration Station 38.3 Cochrane Algonquin Power Natural gas [7]
Durham College District Energy March 11, 2008 2.4 Oshawa Durham College Natural Gas [8]
East Windsor Cogeneration Centre November 6, 2009 84 Windsor East Windsor Cogeneration LP Natural Gas [9]
Goreway Station June 4, 2009 874 Brampton Sithe Global Power Goreway ULC Natural Gas [10]
Greenfield Energy Centre October 16, 2008 1,005 Courtright Greenfield Energy Centre LP Natural Gas [11]
Greenfield South Power Plant Under Construction 280 Sarnia[12] Greenfield South Power Corporation Natural Gas [13]
GTAA Cogeneration Plant February 1, 2006 117 Mississauga GTAA Natural Gas [14]
Great Northern Tri-Gen Facility Under Construction 12 Kingsville Great Northern Hydroponics Natural Gas [15]
Halton Hills Generating Station September 1. 2010 683 Halton Hills TransCanada Natural gas [16]
Iroquois Falls Power Plant 120 Iroquois Falls Northland Power Natural gas [17]
Kapuskasing Power Plant 40 Kapuskasing Atlantic Power Corporation Natural gas [18]
Kingston Generating Station 110 Kingston Northland Power Natural gas [19]
Kirkland Lake Cogeneration Station 102 Kirkland Lake Algonquin Power Natural gas [20]
Lake Superior Power Facility 110 Sault Ste. Marie Brookfield Renewable Power Natural gas [21]
Lennox Generating Station 2,100
44°8′46″N 76°51′9″W Ontario Power Generation Fuel oil / Natural gas [22]
London Cogeneration Facility December 31, 2008 17 London Fort Chicago Natural Gas [23]
Nipigon Power Plant 40 Nipigon Atlantic Power Corporation Natural gas [18]
North Bay Power Plant 40 North Bay Atlantic Power Corporation Natural gas [18]
Ottawa Cogeneration Plant 68 Ottawa TransAlta Natural gas [24]
Portlands Energy Centre 550 Toronto Ontario Power Generation,TransCanada Natural gas [25]
Sarnia Regional Cogeneration Plant January 1, 2006 506 Sarnia TransAlta Natural gas [24][26]
St Clair Energy Centre March 30, 2009 577 St. Clair Township St. Clair Power LP Natural Gas [27]
Sudbury District Energy Cogeneration Plant January 1, 2006 5 Sudbury Toromont Energy Natural gas [28]
Sudbury District Energy Hospital Cogeneration Plant Under construction 6.7 Sudbury Toromont Energy Natural gas [29]
Thorold CoGen L.P. 265 Thorold Northland Power Natural gas [30]
Trent Valley Cogeneration Plant January 1, 2006 8.3 Trenton Sonoco Natural Gas [31]
Tunis Power Plant 43 Atlantic Power Corporation Natural gas [18]
York Energy Centre May 2012 393 King York Energy Centre LP Natural gas [32]
Warden Energy Centre June 4, 2008 5 Trenton Sonoco Natural gas [33]
Windsor Cogeneration Plant 68 Windsor TransAlta Natural gas [24]
TOTAL 13,933.3 Operational

Renewable

Biomass
List of biomass electrical generating stations in Ontario.


Name Date Capacity (MW) Location Owner Type Ref
Atikokan Generating Station September 10, 2014 90
48°50′17″N91°34′15″W Ontario Power Generation Biomass [34]
Becker Cogeneration Plant On Hold 15.0 Hornepayne 1721027 Ontario Inc. Biomass [35]
Brampton 15.1 Brampton Algonquin Power Biomass [36]
Calstock Power Plant 35 Hearst Atlantic Power Corporation Biomass [18]
Cochrane 42 Cochrane Northland Power Biomass [37]
East Landfill Gas to Energy Project December 2007 1 Niagara Falls Glenridge Gas Utilization Inc. Landfill Gas [38]
Eastview Landfill Gas Energy Plant August 18, 2005 2.5 Guelph Ecotricity Guelph Inc (Guelph Hydro) Biomass [39]
Hamilton Cogeneration Plant July 10, 2006 1.6 Hamilton Hamilton Renewable Power Inc. Digester Gas [40]
Thunder Bay Generating Station February 9, 2015 153 Thunder Bay, Ontario Ontario Power Generation Biomass [41]
Trail Road Landfill Generating Facility January 31, 2007 5.3 Ottawa PowerTrail Inc. Landfill gas [42]
TOTAL 360.5 Operational
 
安省的火电厂和其他省不一样,没有煤电了。这是因为 安省煤电厂以前全部都是opg 所属,公营的,所以省政府可以下行政命令关停。其他省很多私营,就复杂的多。

燃气的电厂和烧煤的电厂相比,燃料成本是高,但人力成本下来了。烧煤电厂没有一百来号人,运转不起来。燃气电厂,2个人一个班就可以运行,一个CONTROL ROOM OPERATOR , 一个FIELD OPERATOR。最多再加一个SHIFT ENGINEER。

这样的话,一个班(CREW) 最多三个人,一般4个班,一个电厂12 个人,再加 CHIEF 和 ASSISTANT chief , 一般14个人左右。

人员少,工资就高,大型电厂的运行人员一般小时工资在50左右,少数45, 还有少数60。加班及周末双倍工资, 节假日三倍工资。也就是一般周末在控制室发呆十二个小时,1200刀到手。我以前实习的电厂,虽然控制室有豪华厨房,周末大家一般都不带饭,一个人三十的标准把钱给我出去买吃的。

这样的企业,有人会跳槽吗?没有,所以很难进,一个萝卜一个坑,机会可遇不可求。

那么如果有人休假或生病怎么办?
 
这就是为什么电厂一般只招2级的。

电厂基本都是1级厂, first class plant。1级厂可以给你任何等级的steam time,2级厂不能给你1级 的steam time, 3 级厂只能给你3级和4级的 steam time, 4级厂就只有4级steam time.

同时tssa 规定1级厂的chief engineer 必须是1st class engineer. shift engineer 必须是2级 以上, operator 必须是三级以上。这样理论上来讲, 电厂可以招3级做field operator (控制室operator 很多厂等同于 shift engineer)。

但是, 如果control room operator 或 shift engineer 临时生病或暂时不在岗,3级来替班作本来2级的工作,就是break the law。 如果在此期间发生任何accident,有人要坐吃官司,保险公司也不会理赔。

另外,公司的休假替班计划也很难安排。

所以,目前大型电厂全部招2级,一个班大家轮流作 field operator, control room operator, shift engineer。 这样保险公司的premium 也会大大降低。

那么, 是否三级就没有一点机会了。不是,有些厂设一个3级的作relief engineer, 用于field operator 休假临时顶班,平时做maintenance. 这个relief engineer 一般要求 working towards 2 class, several paper done and with millwright license is asset.

下面介绍一下其他领域的工作机会
 
经常有人问我operating engineer 能否进核电工作,答案是yes or No

加拿大的核电技术采用CANDU自有开发的工艺流程,目前有5个核电厂,3个在安省,1个在魁省,1个在NB。 西边一个没有,

说句题外话,核电厂对于平衡电网负荷有不可低估的作用,目前东部各省基本上是核电,水电,煤电是电网base load, 燃气电厂和其他作peak load. 在没有核电,水电的情况下,关停煤电,只靠燃机电厂,这个是难以想象的,目前好像没有哪一个做到了。

安省关掉煤电的底气就在于充足的水电资源和三个巨无霸核电

其中Bruce 核电是私营的,由8个516MW 反应堆, 是全加拿大最大的。OPG 的 PICKERING 也是有8个,规模稍小。OPG 的 Darlington 有4个。这三个核电占据安省电需求量的40%左右。

安省核电的operator 是不需要 power engineer 证书的,他有自己的证书体系。后面我会详细说到。

operator 的待遇,和前面电厂的待遇差不多。但是,他们的福利实在是太好了:

Defined Benefit 的退休金, 每年10周带薪假,30天带薪病假,根据辐射量的强制休假制度,等等,基本上你工作别人一半的时间, 拿别人双倍的工资,工作满20年或年满60岁,可以申请退休。根据计算公式,最多可以拿最高工资的70%作退休金直至去世,你老伴如果健在,她还可以继续领取部分。

下面再谈谈如何申请
 

注册或登录来发表评论

您必须是注册会员才可以发表评论

注册帐号

注册帐号. 太容易了!

登录

已有帐号? 在这里登录.

Similar threads

顶部